The first step to picking the best roofing contractor for your project is having some idea about the roofing process and how it works. It’s not just about nailing some shingles to your roof, there’s a whole roofing process that keeps you and your home/business safe. Here is a step-by-step guide on what to expect for a typical shingle tear-off and re-installation.

Process
Step 1

Inspection and Estimate

We perform a free visual inspection and identify problem areas on your roof. If possible, we’ll outline repairs that could extend the life of the roof without replacement. But if your roof is too far gone’ we’ll provide a detailed written estimate for replacement.

Permitting

Upon acceptance of our estimate, we’ll begin the process of obtaining all the necessary permits from the applicable municipal authorities.

Step 2

Scheduling

We’ll prepare a target start date and estimated completion schedule. Many residential roofs can be completed in just one or two days, and most roofing activities can continue in varied weather conditions.

Materials may be delivered a day or two before the job begins so everything is in place for the job to start. We will let you know soon after contract signing when we will be bringing the materials to your home.

Before we arrive

Please remove paintings and photos from interior walls, cover your belongings in the attic, and secure items on shelves.

Step 3

The First Day

Work will begin early on the first day, usually around daybreak. Before putting a new roof on, we must tear the old one off. This can be somewhat noisy and messy, but we take steps to minimize the disruption and protect trees and shrubbery. All debris is collected and disposed of in an environmentally responsible manner.

Repair bad wood

We’ll inspect your roof deck and repair or replace any loose, missing, or damaged sections with new ones.

Install substrate, including ice and water shield and underlayment

The first layer of your new roof is very important for its overall performance. We apply Ice and Water Shield on all gutter edges, valleys, walls, skylights, vents, and pipes.

Install flashings around roof transitions such as chimneys, skylights, and vents

Flashing is a metal transition that is installed to prevent water from entering the living space.

Install quality shingles of your choice and a ventilation system

Proper ventilation is essential to the health of your roof and we strongly recommend proper intake and exhaust ventilation.

Step 4

Clean up

We take great care to clean up after ourselves, including collecting all loose roofing nails using a magnet.

Final visual inspection

The job is not done until you are satisfied!

WHY CHOOSE US?

Advantages in hiring AllSafe Roofing

We are proud to say we are family owned and operated and have over 30 years of experience.

We only use the best quality materials that meet or exceed all industry standards.

All warranties will be given in writing to ensure you chose a company you can rely on.

We are fully licensed, bonded, and insured.

We are a second-generation roofing company.

We will give every job time, excellent craftsmanship, and quality materials to get the best results.

We welcome you to fill out our form to receive a FREE estimate.

Get Free Estimate